久久精品A亚洲国产V高清不卡,真人性囗交69视频,护士扒下内裤让我爽一夜,А√天堂资源在线

Welcome to Tianjin Guoce Aerospace Technology Co., Ltd!

Tianjin GuoCe Aerospace Technology Co., Ltd.

Inspection Industry Solution Provider

We are more professional.

Testequipment

Telephone:18322499311

Mobile phone:18920407795

Fax:022-22145487

E-mail:10533646999@qq.com

Address:Chagugang Town, Wuqing District, Tianjin

Wind pressure testing machine

  • Hot Line:18322499311

Highlight-color: rgba(255, 255, 255, 0); margin: 0px; color: rgb(102, 102, 102); font-family: "microsoft yahei", 宋體, Arial; font-size: 14px;">



1、 Main functions of the device:

The Wind pressure testing machine is used to determine whether the equipment can maintain structural integrity and work in high wind speed environments. It is mainly suitable for evaluating equipment working outdoors in mountainous, coastal, island, and other areas, as well as equipment placed on the open deck of ships for work.


2、 Performance indicators and system composition of wind pressure testing machine:


Model GC-FY-80

Sample restrictions: This testing equipment prohibits the testing of flammable, explosive, and volatile substance samples; Testing for storing samples of corrosive substances, testing for storing organisms, testing and storing samples of strong electromagnetic emission sources

Main technical parameters

Environmental conditions for use: ambient temperature of 5-35 ℃, relative humidity ≤ 85% RH

Blow off cross-sectional area 1000mm × 1000mm (fan outlet cross-sectional area)

Wind speed (0-45) m/s (wind speed at the outlet of the fan) adjustable

Air volume: 110600-181800m3/h (1843-3030m3/min)

Wind pressure 951-1402 Pa

Maximum specimen size ≥ 2000mm × 2000mm

The external dimensions of the machine are approximately 4200 × 3700 × 1500mm (W * H * D)

Sample Placement Room

To avoid the influence of surrounding air flow on the wind direction, the sample is placed in a closed room and the laboratory is sufficiently large. The horizontal dimension is at least 3 times the length of the sample placement, and the vertical and vertical dimensions are at least 2 times the length of the sample placement. An automatic pressure relief device or exhaust duct is also installed indoors

Test meets the conditions GJB150.21A-2009 Military Equipment Laboratory Environmental Test Methods Part 21: Wind Pressure Test

GB/T2423.41-94 Basic Environmental testing procedures for electrical and electronic products: Wind pressure test method

Maximum power 75KW

Maximum current of 120A

 

Power supply conditions

And power supply

AC 380V three-phase four wire+protective grounding; The allowable voltage fluctuation range is 10% V;

The allowable frequency fluctuation range is 50 ± 0.5HZ; TN-S power supply or TT power supply

The grounding resistance of the protective grounding wire is less than 4 Ω

Require users to configure corresponding capacity air or power switches for the equipment at the installation site, and this switch must be independently controlled. When placing powered samples in the equipment use box, please use an external power source for the sample power supply and do not directly use the local power supply;

The machine structure adopts a volute centrifugal fan as the power source

The snail shell is made as an assembled type, with a rotating air outlet angle that can be adjusted by ± 90o

Install a lifting frame at the bottom of the fan, which can be raised and lowered vertically with an adjustable range of 0-1000mm

Electrical control system

Centrifugal blower as power source, easy to use and maintain

The speed control of the fan adopts a frequency converter and a variable frequency motor to control the motor speed, achieving the purpose of controlling the wind speed

Requirements for storage, transportation environment, and installation site

Storage environment requirements: The equipment environment temperature should be maintained within 0 ℃ to+35 ℃

The installation site requires that the distance between the left, right, and rear wall panels of the test box and the wall should not be less than 800mm, and the distance between the front and the wall should not be less than 1000mm. When transporting equipment, whether it is possible to enter the entrance or passage, elevator, etc., to avoid affecting the progress of your company's project.

Transportation method: Whole machine transportation



Recommended products

久久精品A亚洲国产V高清不卡,真人性囗交69视频,护士扒下内裤让我爽一夜,А√天堂资源在线

              色翁荡熄又大又硬又粗又视频| 人妻一二三区| 色婷婷久久综合久色| 日本xxx高清| 国产老熟女伦老熟妇av| 久久久久久久久久久久久久国产| 亚洲激情另类| av成人在线看| 无码人妻一区二区三区在线视频| 蜜桃av资源| 好大好湿硬顶到了的好爽视频| 加勒比久久综合| 无码AV免费精品一区二区三区| 色婷婷av一区二区三区影片| 国产精品毛片无码| 在线观看日本中文字幕| 亚洲国产成人精品无码区99| 国产成人一区二区三区在线播放 | 人妻一级| 色综合五月婷婷| 人人妻人人添人人爽欧美一区 | 日韩精品一区二区电影| 97人妻人人做人人爽人人品视频| 68影院午夜理论片| 国产aⅴ激情无码久久久无码| 亚洲国产精品无码专区| 91香蕉视频官网下载| 又色又爽又黄18禁美女裸身无遮挡| 亚洲一二三区av| 国产午夜三级一区二区三| 成全世界免费观看| 精品伦理一区二区三区| 1000部丰满熟妇| 亚洲精品一区二区三区婷婷月| 久久久久精品国产人妻一区二区| 亚洲精品视频一二三区| 亚洲国产精品视频一区| 国产精品久久久久久久四虎电影| 久久变态刺激另类SM孕妇| 丰满少妇高潮| 91啦中文在线|